Building Rail Panels
Home Up Work Days July 2000 Threshers Show Meet Building Rail Panels New Engine House Engine House Move CCRR Ballast Hopper

 

You can't have a railroad without having track.  In our hobby the track has two rails separated by 7.5" and is usually made up of sections (we refer to as track "panels") 10 or 12 feet long. 

PIC00022_2.JPG (73924 bytes) Ron and Gary using a jig to drill pilot holes in the ties for screws separated by the proper distance.

 

PIC00021_2.JPG (71016 bytes) Doc and Larry inserting one screw on each side of the tie.

 

PIC00023_2.JPG (71296 bytes) PIC00024_2.JPG (74408 bytes) Woody, Rick, Jerry and Don have placed the ties in the panel jig and are adding the second screw on each end of the ties to secure the rails.

 

PIC00019_2.JPG (80064 bytes) A completed panel is stacked and a new one is started.

 

PIC00025_2.JPG (51157 bytes) 24 12 foot panels: 48 rails, 624 ties, 2496 screws -> 288 feet of track.  One evening's work for 9 guys ...