Moving The Engine House(Updated 9/7/2003)When we first placed the our Engine House (40' shipping container) at the track (see: New Engine House) it was placed as close as possible to the old lead track. We have since extended the transfer table rail and moved the old lead track to its new location as close as possible to the mainline. We did this so that we could eventually move the Engine House further West giving us more unloading/parking room on the North side of the transfer table. On September 6th Chuck Hackett and Jerry Valasek moved the container West to its new location. (Click on photos for larger version)
|